Roof Replacement Case Study: CertainTeed Pewter on a Storm-Worn Hip Roof

Element Roofing Solutions replaced a storm-damaged gray shingle roof on a single-story hip-roof home, and the write-up below follows that shingle roof replacement from tear-off to ridge cap. In June 2025 Element Roofing Solutions stripped about 3,500 sq ft down to the deck, swapped water-damaged OSB at the eave for new plywood, laid peel-and-stick underlayment and new drip edge over the whole roof, and finished it in CertainTeed Pewter architectural shingles.

Roof area

~3,500 sq ft

Shingle

CertainTeed Pewter

Finished

June 2025

The free on-site inspection gives you a written number for a re-roof of your size.

The Pewter job file in five lines

Town

Florida

Job type

Complete tear-off and re-roof

Shingle line

CertainTeed architectural, Pewter

Area

About 3,500 sq ft

Completed

June 2025

Why the job happened

Why did this homeowner choose a full re-roof over storm repairs?

Storm damage was spread across a gray shingle roof with many intersecting planes, so patching it piece by piece would have left a tired roof with a scatter of fresh spots. The owner of the house decided one complete system made more sense than a string of repairs.

  • The house: a one-story home with a hip roof: several planes meeting at hips and valleys, plus a garage wing that projects toward the street, with gutters along the eaves.
  • Many edges: roofs shaped like this have a lot of edges and transitions, and every one is a place where a storm can lift material or where water can sneak in later.
  • Hard to blend: hip roofs shed wind well, but the many short runs make spot repairs hard to blend.
  • Patches would show: a handful of new shingles on a roof that was already weathered and storm-worn would have stood out on every face of the house.
  • The cleaner decision: for a homeowner planning to stay, starting over at the deck made more sense.
  • Every stage by Element: the tear-off, the deck repair, the dry-in and the new shingles, from the first look to the last ridge cap.

If your own roof is somewhere between a repair and a replacement, our guide to new roofs in Riverview explains how the owner weighs that call on site.

Under the old shingles

What did the tear-off uncover on this Pewter re-roof?

Water damage at the lowest edge of the roof was the main surprise. A complete tear-off is the one moment when every sheet of the deck can be seen, and this deck showed one weak run and a lot of sound wood.

Exposed OSB decking at the eave during a roof replacement — roof replacement for Riverview homes by Element Roofing Solutions

Soft OSB along the gutter line

The sheathing at the eave had soaked up water for a long time. That edge is where runoff lingers longest and where a tired drip edge lets moisture creep back under the shingles.

Granules piled in the gutters

Old granules and roofing debris had collected along the eave, a sign the previous shingles were shedding their protective surface well before the storm finished them off.

A solid deck everywhere else

Past the damaged eave run, the OSB was in serviceable shape. It was cleaned up and prepared for underlayment instead of being replaced for the sake of it.

Replacing only what is actually bad keeps the scope honest. Every Element replacement quote includes two sheets of decking, and anything beyond that is photographed and approved by the homeowner before it goes on the bill.

Scope of work

What work went into the new Pewter roof, in order?

The Pewter re-roof moved through four stages, from storm-worn gray shingles to a new roof system, and each one set up the next stage of the replacement.

A dumpster sat in the driveway for the tear-off so old material went straight off the roof and away from the yard and plantings.

Because peel-and-stick underlayment is standard on every Element install, it was never a line-item upgrade on this quote. The full roof replacement process lays out the same sequence for other homes.

Start a Re-Roof Estimate
  1. 1

    Strip to the deck

    All of the old shingles and underlayment came off down to bare sheathing, and the debris dropped into the dumpster below.

  2. 2

    Cut out the bad eave run

    The water-damaged OSB along the gutter line was removed and new plywood fastened in, so the drip edge and starter row had firm wood to nail into.

  3. 3

    Dry in the whole roof

    Self-adhering peel-and-stick underlayment went across the entire deck, bonding to the wood and sealing around each fastener, with new metal drip edge set along the eaves before any shingle went down.

  4. 4

    Shingle and cap

    CertainTeed architectural shingles in Pewter covered roughly 3,500 sq ft, with hip and ridge cap shingles along every hip line and the ridge.

Photo record

Which materials make up this roof, layer by layer?

Five layers, from the wood up, are what turned this from a patched-over roof into a complete system. The photos run from day one to the finished Pewter surface.

  • New plywood decking at the eave, where the OSB had gone soft.
  • Peel-and-stick underlayment over the full deck, not just the valleys.
  • New metal drip edge along every eave.
  • CertainTeed architectural shingles in the Pewter colour.
  • Matching hip and ridge cap shingles on each hip and the ridge.

A smaller job documented the same way is the chimney leak repair from September 2026, which shows what peel-and-stick does on a 200 sq ft section.

New shingle bundles staged on an old roof before replacement — roof replacement for Riverview homes by Element Roofing Solutions
Day one: new CertainTeed bundles loaded on the old gray roof.
New plywood decking strip installed at the eave of a roof — roof replacement for Riverview homes by Element Roofing Solutions
Fresh plywood where the eave OSB was cut out, dumpster below.
Peel-and-stick underlayment and new drip edge on a re-roof — roof replacement for Riverview homes by Element Roofing Solutions
Dried in: peel-and-stick across the slope, drip edge at the eave.
Completed gray architectural shingle roof — roof replacement for Riverview homes by Element Roofing Solutions
Finished: Pewter shingles with clean hip and ridge lines.
Completed gray architectural shingle roof — roof replacement for Riverview homes by Element Roofing Solutions
Pewter architectural shingles finished on the hip roof, June 2025.

The finished roof

How did the Pewter roof turn out?

The home traded a storm-damaged gray roof for a complete new system: firm decking at the edges, a fully adhered underlayment, fresh drip edge and Pewter shingles with tidy hips and ridge. Pewter reads as a soft mid-gray, so the house kept a similar look from the street while every layer underneath changed.

Fixing the eave before dry-in matters more than it sounds. The old roof had been failing from that edge for years, and a new roof nailed onto the same soft wood would have inherited the weakness on day one.

  • Workmanship backed by Element’s 5-year warranty, which excludes storm damage and manufacturer defects.
  • Shingles carry CertainTeed’s own product warranty on top of that.
  • One point of contact the whole way: the licensed owner, CCC1336059.

Comparing shingle colours for your own house? The architectural shingle options for Riverview homes page covers how colour choices and HOA lists usually work.

Reading this for your own house

What does this job mean for your roof?

The lessons carry over to most shingle roofs in Riverview and nearby towns, especially homes with gutters and long eave runs.

Check the edges

Is your eave hiding the same problem?

Look for sagging at the gutter line, stained fascia or drip edge that has pulled away. Those are clues the wood behind the first course is wet.

Repair or replace

When does a storm-hit roof need starting over?

When damage touches many faces and the shingles were already shedding granules. A few lifted tabs on a younger roof are usually a repair; read the Riverview storm repair page for that side.

Price

Would decking blow up the quote?

Two sheets are already included. Anything past that is shown in photos and approved by you before it is added.

Timing

How long would the roof be open?

Installs usually start one to two weeks after signing and most take one or two days on the roof itself.

From homeowners

What do Element customers say about re-roof jobs like this?

The company holds a 5.0 average from 21 Google reviews, and the owner has finished about 100 roofs over a career that began years before the business opened in 2024. Seven years of the owner’s own roofing experience sit behind each inspection, and reviewers keep coming back to the same two things: being told what is happening and a clean property at the end. The costs behind a job like this one are broken down in our guide to what drives a Tampa Bay re-roof price.

“made the whole process feel easy and stress free”

— Ally, May 2026, Google review

“It’s hard to find contractors you can trust these days”

— Luis G., June 2026, Google review

More re-roof photos

Where can you see this re-roof alongside other Element replacements?

The first five photos are this Pewter job; the rest are other recent Element shingle replacements, all from the owner’s own camera.

New shingle bundles staged on an old roof before replacement — roof replacement for Riverview homes by Element Roofing Solutions
Bundles staged (a stage of the Pewter re-roof story)
Exposed OSB decking at the eave during a roof replacement — roof replacement for Riverview homes by Element Roofing Solutions
Eave decking opened (a stage of the Pewter re-roof story)
New plywood decking strip installed at the eave of a roof — roof replacement for Riverview homes by Element Roofing Solutions
New eave plywood (a stage of the Pewter re-roof story)
Peel-and-stick underlayment and new drip edge on a re-roof — roof replacement for Riverview homes by Element Roofing Solutions
Peel-and-stick, drip edge (a stage of the Pewter re-roof story)
Completed gray architectural shingle roof — roof replacement for Riverview homes by Element Roofing Solutions
Finished Pewter re-roof (a stage of the Pewter re-roof story)
Aerial view of a large shingle installation — roof replacement for Riverview homes by Element Roofing Solutions
Shingle install, aerial (another Element replacement)
Architectural shingle roof replacement — roof replacement for Riverview homes by Element Roofing Solutions
Architectural shingle re-roof on a different Element job
New architectural shingles at sunset with the ridge vent going on, North DeLand — roof replacement for Riverview homes by Element Roofing Solutions
Another Element re-roof, in North DeLand: ridge vent going on at sundown
Large shingle roof installation — roof replacement for Riverview homes by Element Roofing Solutions
Large shingle install from another job

About this project

Questions about the Pewter replacement

Short answers on the details homeowners ask about most after seeing this job.

How big was the roof on this job?

Roughly 3,500 square feet of shingle area on a single-story hip roof with a front garage wing.

What colour is CertainTeed Pewter?

CertainTeed Pewter is a soft mid-gray architectural shingle. On this house it kept a gray look similar to the old roof while every layer underneath was new.

Was all of the decking replaced?

No, only the water-damaged run of decking along the eave was cut out and replaced with plywood. The rest of the OSB was sound and was prepared for underlayment.

Why use peel-and-stick across the whole deck?

Peel-and-stick underlayment went across the whole deck because it bonds directly to the wood and seals around every nail, so wind-driven rain that gets under a shingle still meets a sealed layer. Element installs it on every roof as standard.

Could the storm-worn roof have been repaired instead of replaced?

Spot repairs were possible, but storm damage was spread across many hip and valley planes, so a handful of fresh shingles would have stood out on every face of the house. The homeowner chose one complete system instead, and Element finished it in June 2025.

How long does it take to replace a shingle roof?

Expect a day or two of actual roof work on most Element shingle jobs, and plan for the crew to begin a week or two past signing. Waiting on an HOA or the county permit can stretch the calendar, while the roof work stays short.

What warranty came with the new roof?

Element’s 5-year workmanship warranty, which excludes storm damage and manufacturer defects, plus CertainTeed’s product warranty on the shingles.